Severe traffic congestion on the Lagos-Ibadan Expressway has disrupted movement between Lagos and Ogun State, with some transport operators reportedly increasing fares to as much as ₦5,000 on affected routes.
The gridlock has been linked to ongoing repair work around the Kara Bridge corridor, a major section of the expressway that carries heavy daily traffic between Lagos and other parts of the South-West and beyond.
Motorists and commuters have faced prolonged delays as vehicles struggle to move through the affected section, with the congestion reportedly extending to adjoining routes.
The disruption has also affected commercial transport operators, with some passengers reportedly paying significantly higher fares as drivers contend with longer journey times, increased fuel consumption and traffic diversions.
A fatal road crash was also reportedly recorded near Ipara Remo, with four people said to have died in the incident.
Details surrounding the crash, including the identities of the victims and the circumstances that led to the collision, should be confirmed by the relevant emergency and road safety authorities.
The Lagos-Ibadan Expressway remains one of Nigeria’s busiest highways and a major transport link connecting Lagos with Ogun, Oyo and other parts of the country.
The ongoing congestion has renewed concerns over the impact of major road works on commuters and businesses that depend on the highway, particularly during periods of heavy traffic.
Authorities and contractors handling the Kara Bridge works are expected to continue efforts to manage traffic flow and minimise disruption to road users as the repairs progress.

AbdulBasit Saba is a journalist and contributor to Freelanews.com, covering news, business, and public affairs.





















